国产精品久久久久久久久久久,被老师粗大jib捣出了白浆视频,国产精品无码a∨麻豆,躁躁躁日日躁

ACEG’s First Investment in Yangtze River Bridge Project
  |  Updated: 2024-12-25  |  Views: 1992

Recently, ACEG won the S24 Hangzhou to Hefei Expressway Wuhu Taishan Road Yangtze River Bridge and Connection Works, which is ACEG's first investment in Yangtze River bridge project.

With total investment of about RMB15.5 billion Yuan, 48 months of construction period and 356 months of toll-charging period, it has 30.88km of main line and 14.35km of connection line. The starting point crosses with G4231 Nanjing–Jiujiang Expressway and the ending point with G4211 Nanjing–Wuhu Expressway with 4 toll stations and six locations of interconnection along the whole route.

Included in "Layout Planning of Crossing Passages for Yangtze River Trunk Line (2020-2035)", the project can effectively improve the local expressway network and promote economic and social development along the route. Upon completion, it will play an important role in implementing the national strategy of integration of Yangtze River Delta, promoting high-quality development of Yangtze River Economic Belt.

Since 2024, ACEG has focused on high-quality market development, and successively invested in a number of major franchise projects in Anhui province, achieving reasonable growth in quantity and effective improvement in quality, continuously accelerating ACEG’s development featuring transformation, high-quality and large-scale.


主站蜘蛛池模板: 江阴市| 太仆寺旗| 和田市| 花莲市| 英山县| 沧州市| 四会市| 越西县| 隆回县| 渭源县| 扎兰屯市| 临安市| 鄂州市| 青神县| 平罗县| 福海县| 包头市| 汤原县| 齐河县| 昌邑市| 许昌市| 泌阳县| 峡江县| 仙桃市| 石楼县| 镇原县| 南澳县| 登封市| 游戏| 灵武市| 卢氏县| 泽州县| 长阳| 左贡县| 胶南市| 盐城市| 花莲市| 广水市| 循化| 上犹县| 阿城市|